Volume 9 Final QA
Status
Volume 9 is complete through Q450.
The current content boundary is:
Q376-Q450
75 questions
15 batches
Automated Checks
Run before publishing a final refresh:
npm run test
npm run typecheck
npm run build
Manual Browser Checks
Check these user workflows:
/volume-9
/batch/volume-9-batch-15
/questions/volume-9-closure-and-next-volume-planning
/practice/javascript
/practice/typescript
/docs
Practice Ground QA
Validate:
JavaScript run and console output
TypeScript feedback states
copy code buttons
copy console buttons
clear console action
Tab indentation
Shift Tab outdent
Alt ArrowDown duplicate line or block
Ctrl or Command Enter run shortcut
Ctrl or Command L clear shortcut
saved snippets save, load, conflict, delete, and reload behavior
Theme QA
Validate:
system theme
light theme
dark theme
theme persistence
button contrast
practice panels
snippet cards
docs pages
question reader
Responsive QA
Validate:
mobile width
tablet width
laptop width
desktop width
long titles
long snippet text
long console output
home topic cards
volume cards
batch cards
Artifact QA
Check:
PDF generation after Q450: generated for volume-9-batch-15.pdf
PDF visual open check: rendered and inspected the two-page PDF
portfolio screenshots after latest UI
sitemap includes Q450 routes
manifest uses Learning Studio naming
favicon and app icons render
custom domain resolves
Pending Follow-Ups
- Capture final portfolio screenshots from the live site.
- Capture final portfolio screenshots from the live site.
- Decide whether Volume 10 should be project capstones, production debugging labs, or portfolio delivery.
- Consider future saved-snippet search, export, and import after the current local workflow is stable.
- Add browser-level tests for console cap behavior if the practice ground grows further.